BoB file (Brick-of-Bytes) (537 MB)
Cement paste prepared from Cement and Concrete Reference Laboratory
cement 133. Water to cement ratio of 0.3. Eight hours of hydration.
Sample prepared at 1:00 am on September 14, 2000 at the ESRF facility
near Grenoble, France and viewed at 9:00 am on the same day.
This image file is pate03_3_8hvol2.bob and is for volume 2 only.
Image is 512*1024*1024 bytes with each byte having a 0-255 value.
300x300x300 subvolume pate03_3_8hv2c300.img extracted with central coordinates
of (500,500), skipping no slices from the top of the dataset.
|